Historically, ruptures in near-neutral pH SCC environments on gas transmission pipelines have been associated with some kind of stress raiser, generally the long-seam weld, corrosion, or dents/gouges. The current work provides an assessment of the effect of dents on environmental cracking. A dent assessment model was combined with a recently developed crack growth rate model to simulate crack growth in high-stressed areas caused by the presence of a dent. The work suggests that unrestrained dents (indenter removed) provide higher stresses and result in faster crack growth than restrained dents (indenter held in place). A dent in a lower ductility, higher strength X-65 steel further promoted the formation of high stresses and crack growth. Small crack growth and crack growth on gas lines, when governed by a strain rate based crack growth mechanism, may be less sensitive to dent parameters than crack growth governed by corrosion fatigue. It should be noted that neither the dent assessment model nor the crack growth model have been fully validated. Further work using elastic-plastic Finite Element Analysis is needed to determine more accurately the extent of stress intensification of a crack growing in or near a dent.
Skip Nav Destination
2006 International Pipeline Conference
September 25–29, 2006
Calgary, Alberta, Canada
Conference Sponsors:
- Pipeline Division
ISBN:
0-7918-4262-2
PROCEEDINGS PAPER
Stress Intensification and Crack Growth in the Presence of Dents on Pipelines
Jenny Been,
Jenny Been
NOVA Chemicals Corporation, Calgary, AB, Canada
Search for other works by this author on:
Blair Carroll,
Blair Carroll
BMT Fleet Technology Limited, Kanata, ON, Canada
Search for other works by this author on:
Aaron Dinovitzer,
Aaron Dinovitzer
BMT Fleet Technology Limited, Kanata, ON, Canada
Search for other works by this author on:
Robert Sutherby
Robert Sutherby
TransCanada PipeLines Limited, Calgary, AB, Canada
Search for other works by this author on:
Jenny Been
NOVA Chemicals Corporation, Calgary, AB, Canada
Blair Carroll
BMT Fleet Technology Limited, Kanata, ON, Canada
Aaron Dinovitzer
BMT Fleet Technology Limited, Kanata, ON, Canada
Robert Sutherby
TransCanada PipeLines Limited, Calgary, AB, Canada
Paper No:
IPC2006-10415, pp. 589-595; 7 pages
Published Online:
October 2, 2008
Citation
Been, J, Carroll, B, Dinovitzer, A, & Sutherby, R. "Stress Intensification and Crack Growth in the Presence of Dents on Pipelines." Proceedings of the 2006 International Pipeline Conference. Volume 2: Integrity Management; Poster Session; Student Paper Competition. Calgary, Alberta, Canada. September 25–29, 2006. pp. 589-595. ASME. https://doi.org/10.1115/IPC2006-10415
Download citation file:
14
Views
Related Articles
Crude Oil Corrosion Fatigue of L485MB Pipeline Steel
J. Pressure Vessel Technol (October,2015)
Observations on the Interaction of High Mean Stress and Type II Hot Corrosion on the Fatigue Behavior of a Nickel Base Superalloy
J. Eng. Gas Turbines Power (January,1985)
Quantitative Evaluation of Environmentally Assisted Cracking: A Survey of Developments and Application of Modeling Concepts
J. Pressure Vessel Technol (February,1991)
Related Chapters
Subsection NB—Class 1 Components
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Life Extension of Mooring Chains - Including Effects of Mean Load and Corrosion Condition to Fatigue Capacity
Ageing and Life Extension of Offshore Facilities
Direct Assessment: Process, Technologies and Modeling
Pipeline Integrity Management Systems: A Practical Approach